7
2018-07-27 17:16:54 UTC
Shiite Internet cumpany BT (British Telecum) still double installing fake fiber despite DCMS ban
------------------------------------------------------------------------------------------------
https://www.ispreview.co.uk/index.php/2018/07/bt-fttp-broadband-covers-631k-uk-premises-and-g-fast-1-12m.html
DCMS has already made it clear double installation should be avoided
https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/727889/Future_Telecoms_Infrastructure_Review.pdf
BUTT BT Offcum Openroach VM are not listening. They still contine their expansion of
fake fiber. Its not needed as illustrated in this diagram:
https://www.ispreview.co.uk/index.php/2018/06/openreach-reveal-next-uk-areas-for-g-fast-ultrafast-broadband.html
The fiber comes in at the left, and using a lot of expensive
equipment £50,000+ it is converted to slow copper signals
and sent by poles to houses.
All of that copper has to be scapped.
So in effect, this is a 4x installation jobbie.
First install the fiber, second install the poles for copper
roll out, then third in 5 years remove the poles, fourth fit fiber.
The ugly poles are necessary otherwise
the ducts have be brick lined to prevent water ingress.
But fiber can remove all poles (and £50,000 cabinets). They don't care
about water and in the countryside, the fastest rate
of cabling is about 4km per day while the latest kerb
trenching machines for urban areas travers hundreds of meters per day.
Because of the shiite £50,000 cabinet, which is not needed by pure fiber,
the fsckwits have to charge £1000 for 1gbit as starting price and go all the
way up to £8000 for the same thing due to the amounts of copper in
the middle. So naturally, while the telecum is 'available' to 1.2 million
customers, no one bought the fscking thing.
So the fscking government is being conned into parting with moneeey
for the £50,000 cabinets which if installed pushes up the provision
cost from £150 to £8000. You would have to be a hard pressed
wahahahanker to buy such crap from BT openroach offcum VM shiite telecum
cumpanies.
Its time to do away with openroach, BT, offcum, vm and replace with
pure fiber companies.
They are all shiite cumpanies that should have stopped doing double
installations as soon as the government report came out
to switch to doing fiber all the way for one time install without cabinets.
Britain's shiit telecum men and women now falls to 90th place below Philippines for 5G
--------------------------------------------------------------------------------------
Britains shiite telecum men and women in DCMS, offcum, BT (British Telecum),
Openroach, VM et al are not the brightest sparks
compared to Philippines today as Philippines telecum cumpany
announce 5G roll out in 2019 under threat by Duterte to fscking
do 'em in with a 3rd national telco if the 2 encumbants dragged their feet.
It seems this State based threatening behavior model
is the best government model to follow when dealing with
stubborn shiite telecum cumpanies.
Threaten their income directly by setting up a new and independent
telco with a mission to eat into underperfoming competitors.
This model guarantees telecum cumpanies will pee in their panties and do as they are told.
Of course with someone like Duterte saying he's going to
fscking do 'em in, they pee in their panties any way, because he will.
In response to a shiite government document
https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/727889/Future_Telecoms_Infrastructure_Review.pdf
Offcum shiites already states that it will do something about it in 2019.
The faaking tossers!!
While UK 5G roll out is stalled, and all investment decisions on 5G put
on hold until symmetric gigabit has been rolled out
and lamp posts every 300m have 10gbit fiber in,
people who identify themselves as Department of Culture Media and Spurts
will have tea and wait for 2019 instead of setting up
a separate department to deal with symmetric gigabit fiber roll out without
the encumbrances of culture, media cumpanies and spurt cumpanies
and rolling out gigabit symmetrif fiber everywhere.
Technology is exponentially rising on the Technological
Singularity curve. The Technological Signularity be here
in 17 years by year 2035. This means symmetric gigabit
fiber demand, 5G, IoT, AI, MI, AR, VR are all on exponential growth
doubling every year or so. Every day wasted mean loosing more
than 2 days of revenue and gains lost with current
pace of technology.
So while people who identify themselves as a department
for culture, media and spurts have tea, they are responsible
for kissing good bye to millions of high tech jobs and
services. They have no idea what technology is because
they identify themselves as experts on culture, media and spurts
which is completely unsatisfactory.
What we need is dedicted infrastructure team focused
on rolling out fiber today. All copper telecum fake fiber work can
cease today and this picture shows why:
https://www.ispreview.co.uk/index.php/2018/06/openreach-reveal-next-uk-areas-for-g-fast-ultrafast-broadband.html
The fiber comes in at the left, and using a lot of expensive
equipment £50,000+ it is converted to slow copper signals
and sent by poles to houses.
Modern cabling doing away with the £50,000+ 'cabinet' and man months
of labour and then you got enough funds to cable up 400 customers
with fiber (£150 each) which is a lot more customers than a stupid
cabinet can handle.
All copper telecum fake fiber work can
cease today and install fiber directly:
But stubborn BT, Offcum, Openroach, VM, and politicians who
like to be known and culture, media and spurt experts taking tea,
they have no idea how to stop their own crap roll out
and switch to more advanced roll out with direct fiber.
Waank wahanank WAHANAK! Splattt! Offcum message to UK gov DCMS
--------------------------------------------------------------
Waank wahanank WAHANAK! Splattt! Offcum message to UK gov DCMS proposal
https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/727889/Future_Telecoms_Infrastructure_Review.pdf
They say they will look at it in 2019.
Waank wahanank WAHANAK! Splattt!
Probably decisions in 2020.
Waank wahanank WAHANAK! Splattt!
Implementation time will be given until 2025.
Waank wahanank WAHANAK! Splattt!
Waank wahanank WAHANAK! Splattt! Oop and extra one sneaked in there!
Wink wihanank WAHINAKI! Splattt! Disguised one there in lieu that started snuck in.
So it seems the government report has led to offum
into turbo master bation mode over symetric gigabit fiber roll out.
The delay tactics is for time to consult with their masters
at BT (British Telecum) and Openroach and earn more brown
envelopes stuffed full of bit coins.
Still no word why offcum charges dark fiber tax so that a 10gbit
is £85,000 around M25 while incumbents pay £150/m for same thing
though Dark Fiber Tax.
All meeting, hanshakes, private calls betwen BT Openroach and Offcum
to be recorded from now on and deleted in case it provides
self incriminating evidence.
------------------------------------------------------------------------------------------------
https://www.ispreview.co.uk/index.php/2018/07/bt-fttp-broadband-covers-631k-uk-premises-and-g-fast-1-12m.html
DCMS has already made it clear double installation should be avoided
https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/727889/Future_Telecoms_Infrastructure_Review.pdf
BUTT BT Offcum Openroach VM are not listening. They still contine their expansion of
fake fiber. Its not needed as illustrated in this diagram:
https://www.ispreview.co.uk/index.php/2018/06/openreach-reveal-next-uk-areas-for-g-fast-ultrafast-broadband.html
The fiber comes in at the left, and using a lot of expensive
equipment £50,000+ it is converted to slow copper signals
and sent by poles to houses.
All of that copper has to be scapped.
So in effect, this is a 4x installation jobbie.
First install the fiber, second install the poles for copper
roll out, then third in 5 years remove the poles, fourth fit fiber.
The ugly poles are necessary otherwise
the ducts have be brick lined to prevent water ingress.
But fiber can remove all poles (and £50,000 cabinets). They don't care
about water and in the countryside, the fastest rate
of cabling is about 4km per day while the latest kerb
trenching machines for urban areas travers hundreds of meters per day.
Because of the shiite £50,000 cabinet, which is not needed by pure fiber,
the fsckwits have to charge £1000 for 1gbit as starting price and go all the
way up to £8000 for the same thing due to the amounts of copper in
the middle. So naturally, while the telecum is 'available' to 1.2 million
customers, no one bought the fscking thing.
So the fscking government is being conned into parting with moneeey
for the £50,000 cabinets which if installed pushes up the provision
cost from £150 to £8000. You would have to be a hard pressed
wahahahanker to buy such crap from BT openroach offcum VM shiite telecum
cumpanies.
Its time to do away with openroach, BT, offcum, vm and replace with
pure fiber companies.
They are all shiite cumpanies that should have stopped doing double
installations as soon as the government report came out
to switch to doing fiber all the way for one time install without cabinets.
Britain's shiit telecum men and women now falls to 90th place below Philippines for 5G
--------------------------------------------------------------------------------------
Britains shiite telecum men and women in DCMS, offcum, BT (British Telecum),
Openroach, VM et al are not the brightest sparks
compared to Philippines today as Philippines telecum cumpany
announce 5G roll out in 2019 under threat by Duterte to fscking
do 'em in with a 3rd national telco if the 2 encumbants dragged their feet.
It seems this State based threatening behavior model
is the best government model to follow when dealing with
stubborn shiite telecum cumpanies.
Threaten their income directly by setting up a new and independent
telco with a mission to eat into underperfoming competitors.
This model guarantees telecum cumpanies will pee in their panties and do as they are told.
Of course with someone like Duterte saying he's going to
fscking do 'em in, they pee in their panties any way, because he will.
In response to a shiite government document
https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/727889/Future_Telecoms_Infrastructure_Review.pdf
Offcum shiites already states that it will do something about it in 2019.
The faaking tossers!!
While UK 5G roll out is stalled, and all investment decisions on 5G put
on hold until symmetric gigabit has been rolled out
and lamp posts every 300m have 10gbit fiber in,
people who identify themselves as Department of Culture Media and Spurts
will have tea and wait for 2019 instead of setting up
a separate department to deal with symmetric gigabit fiber roll out without
the encumbrances of culture, media cumpanies and spurt cumpanies
and rolling out gigabit symmetrif fiber everywhere.
Technology is exponentially rising on the Technological
Singularity curve. The Technological Signularity be here
in 17 years by year 2035. This means symmetric gigabit
fiber demand, 5G, IoT, AI, MI, AR, VR are all on exponential growth
doubling every year or so. Every day wasted mean loosing more
than 2 days of revenue and gains lost with current
pace of technology.
So while people who identify themselves as a department
for culture, media and spurts have tea, they are responsible
for kissing good bye to millions of high tech jobs and
services. They have no idea what technology is because
they identify themselves as experts on culture, media and spurts
which is completely unsatisfactory.
What we need is dedicted infrastructure team focused
on rolling out fiber today. All copper telecum fake fiber work can
cease today and this picture shows why:
https://www.ispreview.co.uk/index.php/2018/06/openreach-reveal-next-uk-areas-for-g-fast-ultrafast-broadband.html
The fiber comes in at the left, and using a lot of expensive
equipment £50,000+ it is converted to slow copper signals
and sent by poles to houses.
Modern cabling doing away with the £50,000+ 'cabinet' and man months
of labour and then you got enough funds to cable up 400 customers
with fiber (£150 each) which is a lot more customers than a stupid
cabinet can handle.
All copper telecum fake fiber work can
cease today and install fiber directly:
But stubborn BT, Offcum, Openroach, VM, and politicians who
like to be known and culture, media and spurt experts taking tea,
they have no idea how to stop their own crap roll out
and switch to more advanced roll out with direct fiber.
Waank wahanank WAHANAK! Splattt! Offcum message to UK gov DCMS
--------------------------------------------------------------
Waank wahanank WAHANAK! Splattt! Offcum message to UK gov DCMS proposal
https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/727889/Future_Telecoms_Infrastructure_Review.pdf
They say they will look at it in 2019.
Waank wahanank WAHANAK! Splattt!
Probably decisions in 2020.
Waank wahanank WAHANAK! Splattt!
Implementation time will be given until 2025.
Waank wahanank WAHANAK! Splattt!
Waank wahanank WAHANAK! Splattt! Oop and extra one sneaked in there!
Wink wihanank WAHINAKI! Splattt! Disguised one there in lieu that started snuck in.
So it seems the government report has led to offum
into turbo master bation mode over symetric gigabit fiber roll out.
The delay tactics is for time to consult with their masters
at BT (British Telecum) and Openroach and earn more brown
envelopes stuffed full of bit coins.
Still no word why offcum charges dark fiber tax so that a 10gbit
is £85,000 around M25 while incumbents pay £150/m for same thing
though Dark Fiber Tax.
All meeting, hanshakes, private calls betwen BT Openroach and Offcum
to be recorded from now on and deleted in case it provides
self incriminating evidence.